Supply Chain
Network Control Tower.

Recover the network.
Not just the first bottleneck.

Loading experiment…

01 / EXPLORE THE NETWORK

One disruption. Five responses.

What changes versus no intervention?

Deterministic reference · same arrivals and original commitments · full nine-day horizon

Daily network flow

DETERMINISTIC REFERENCE

FIFO processing. Port release and DC delivery may happen on the same day. Capacities are containers per day.

Backlog across the network

Port DC No-action total

End-of-day containers waiting · Day 2–4: reduced port capacity · Day 5–6: intervention window.

02 / COMPARE THE OPTIONS

Pressure-tested, not promised.

500 PAIRED TRIALS

The same demand and capacity shocks are applied to every option. Values show P10 / median / P90 across simulations.

ResponseMissed commitments
containers
Peak DC backlog
containers
Queue recovery
simulation day
DECISION INSIGHT

03 / FOLLOW THE EVIDENCE

A container's original commitment

Due dates are fixed at arrival + 1 day; an intervention never rewrites the promise.

04 / KNOW THE LIMITS

A transparent experiment

EYESTERION is fictional. These are simulated operations, not live shipments or calibrated forecasts.

Model, uncertainty & assumptions
  • 60 arrivals per day for six days; nine-day horizon.
  • Port and DC base capacity: 80/day. Disrupted port: 40/day on days 2–4.
  • Selected nodes receive 110/day capacity on days 5–6.
  • Independent uniform daily variations: arrivals ±10; each node capacity ±8. Scenarios share the same draws.
  • Recovery is the first permanently queue-free day from day 5; >9 means outside the horizon.
  • On-time delivery is measured per container, not order-level OTIF. No transport time, stock, partial deliveries or monetary optimization.
  • P10–P90 is an 80% simulation interval, not a guarantee. Parameters require real-world calibration.

Download experiment JSON ↗
Inspect daily flow and container delivery ledger
DayArrivalsPort releasedPort waitingDC deliveredDC waiting
ContainerArrivedDuePort releasedDeliveredCommitment